Skip to Content
Odoo Gold Partner Delivering to clients in 14 countries +94 777 267 162 info@nerosoftsolutions.com

/industries

Odoo for manufacturing

Know what every product really costs to make.

  • 1,300+ Active SKUs on the largest build
  • 3 Export markets served

/where-it-breaks

Where it breaks, before anyone mentions software.

  1. 01

    Your bill of materials is a catalogue, not a BOM.

    Prints and fabric arrive from separate vendors, but nothing in the system connects either one to what a finished product really costs. A paper catalogue is fine for browsing and no use for costing. Ask what a product costs and the answer is to find the person who remembers. When a batch goes wrong, you cannot trace it back.

  2. 02

    Work in progress lives on paper.

    On a floor of 600+ people, cutting, printing, assembly and quality are all tracked on hard copy. To learn what is in progress right now, someone has to walk the floor and count.

  3. 03

    Without a system of record, there are no KPIs you can trust.

    Management cannot calculate a figure it believes. Production problems surface late, if they surface at all. Finance has no live view of what purchasing and production are doing.

  4. 04

    Cost, quality and finance tell three different stories.

    Finance is not linked to purchasing. Quality checks happen, but a failed batch has nowhere defined to go. The three functions that should describe one product describe it three different ways.

/configuration-choices

Five decisions we make early

  • BOMs split at component level. Prints and fabric are tracked separately from intake, because that is how your vendors and your floor already work. See Manufacturing.
  • A quality-fail location in the routing. A rejected batch has a defined place to go instead of disappearing into general stock. See Inventory and warehouse.
  • Standard costing set before go-live. Day-one production carries a real cost, not an estimate. See Accounting and finance.
  • Serial number tracking from raw material to shipped unit. When something goes wrong, you can follow it back to where it started.
  • Quality results trigger the next manufacturing step. A pass does not sit waiting for someone to notice it.

/what-we-will-not-do

And five we argue against

  • We will not force a wholesale data migration. Only finance data moved across, in one month. The rest stayed as historical record, so go-live was quicker and the new system started clean.
  • We will not automate export paperwork before the basics work. Shipping documents come first, and full automation waits until they are solid.
  • We will not impose a textbook BOM on a floor that thinks in prints and fabric. We configure Odoo to match how your work really happens, so your team recognises it on day one.
  • We will not customise everywhere it is tempting. We built one automation, moving the order on after a quality pass, because that was the real bottleneck. Every line of custom code is a maintenance cost.
  • We will not add multi-company complexity to a single-entity, single-site business. Multi-currency, yes. Multiple companies, no.

In this sector: a single-site apparel manufacturer with 1,300+ active SKUs, exporting to three markets, live in 12 months.

Reference on request. Released at proposal stage, under NDA.

/next

Tell us what you are running today.

Twenty minutes, no slides. We will tell you straight if Odoo is not the answer.